This Saturday 02/25/2012 starting at 06:00 CST, the building we are housed in is performing a major maintenace to the main power feeds.  The outage is scheduled between 06:00 CST and 18:00 CST.  We have been preparing for this event, and are not expecting in interuption in services but wanted to make all clients aware.  We will be failing over the UPS and generator power for the entire event and bringing in an addtional generator to run cooling, and various other utilities that may be needed.



Monday, February 20, 2012





« Back